The final section of the Old Spences Bridge is removed March 11

Bridges, blacktop in B.C. transportation plan

10-year program includes trucking strategy and provincial cost sharing for community airports and bike lanes

A 50 per cent increase in bridge rehabilitation and 1,000 km of highway repaving each year are included in a 10-year transportation plan released Tuesday by B.C. Transportation Minister Todd Stone.

The plan also includes $24 million over three years to pay a provincial share of community airport improvements and an $18 million fund for bike lanes and cycling trails.

A province-wide trucking strategy is also included in the plan, which restates several projects previously announced by the government. They include work on a replacement for the Massey tunnel under the Fraser River in South Delta, planning for a second bridge across Okanagan Lake at Kelowna, and conversion of BC Ferries vessels to use liquefied natural gas fuel.

Overall the plan includes $800 million over three years to upgrade existing infrastructure and nearly $1 billion toward expansion of major highways.

With an eye to an aging as well as growing population, disabled access projects are to include accessible washrooms and curbs at highway rest areas and wheelchair accessible taxis in communities around B.C.

NDP transportation critic Claire Trevena called the 10-year plan “insulting to the people of B.C.,” with only three years of funding promised and most of the improvements already announced.

“There are lots of vague promises that have been made for many years,” Trevena said. “For instance the four-laning of the Trans-Canada to the Alberta border, finishing off the Cariboo Connector, finishing off bridges.

“If you’re investing in bridges, let’s get some strategic analysis of our bridges, and where we need them and how we’re going to pay for them.”

With ballots going out to Metro Vancouver voters for a plebiscite on funding new transportation improvements through a regional 0.5% sales tax, the provincial plan focuses heavily on rural areas. It includes an increase to $270 million over three years to upgrade provincial side roads and $60 million for resource roads in the northeast B.C. gas patch.

One major commitment for the Lower Mainland is to continue the six-laning of Highway 1 from Langley to Abbotsford.

 

Just Posted

The end of an Echo

Invermere Valley Echo shuts down operations in Columbia Valley

Creating a new narrative for Canal Flats

Economic development consultant hired, lists vision for next 90 days

UPDATE: Crews battle as wildfires rage in B.C. Interior

Crews brace for another day on B.C. firelines as no let up is likely

VIDEO: B.C. wildfires by the numbers

Wildfires continue to engulf regions of B.C.’s forests and communities.

VIDEO: More than 180 wildfires burning across B.C.

Firefighters from other provinces called in to assist

DTSS Grad March 2017

DTSS Grad March 2017

59 cats seized in Chase

59 neglected and injured cats were seized from a property in Chase

Soundgarden singer Chris Cornell dead at age 52

The singer/songwriter passed away early Thursday morning in Detroit

Paying tribute to a primeval passage

Uninterrupted celebrates the Adams River sockeye run in an extraordinary way.

UPDATE: Pemberton Music Festival cancelled, no automatic refunds

In the past, the music festival located in Pemberton drew large crowds last year of 180,000 fans

Medical wait times cost B.C. patients $2,300 each

New Fraser Institute report places B.C. at second worst in costs associated with long wait times

UPDATE: 22 killed at Ariana Grande concert

Witnesses reported hearing two loud bangs coming from near the arena’s bars at about 10:35 p.m.

One in three Canadian high school students have rode with drinking drivers, study reveals

Nearly one in five rode with a driver who’d been smoking pot

Top court to hear federal government’s appeal on residential school records

A lower court judge ruled to destroy the stories after 15 years unless consent is given to preserve

Most Read